1.12 Calendar Maintenance(01151m)

A Muli calendar provides the basis for determining the normal working days on a project. Calendars exist for each different day-count basis for each of the Australian States & Territories plus Hong Kong.  The standard calendars supplied in a new installation include ACT 5 day, QLD 5 day, HK 5 day, etc.

These calendars provide a relevant basis for calculating key times within Muli such as:

  1. Variation (Extension of Time)
  2. Project Scheduling
  3. Time Sheet Maintenance Background colour

So if we are calculating Concrete Curing, use Calendar 100 - which is a 7 day calendar.

For a normal 5-day Working contract in NSW, use Calendar 102; and if the contract called for a 6-day week, 202 would be applicable as Saturday would be a working day.

calendar maintenance

  1. Scheduling Calendar 451
  2. Date
  3. Non Working Day 455